"We were behind in construction and needed to get a concrete floor poured followed by an AgriQuality-approved floor topping. Everyone told us we needed to allow 28 days for the concrete to cure and up to 7 days for the resin coating to cure.
Topcoat supplied a solution to both of these problems, enabling us to fast-track the cure time of the concrete and the topping. The topping system was a rapid-cure Degadur resin.
"The result is excellent – well done to the Topcoat team."
Bob Walker - Cool Trans
WHY DEGADUR? Click here to download brochure
|